EPS Carries out Light and Power Efficiency Analysis & Upgrades to existing installation as follows:
Arrange with the owner/occupier a time when the Audit can be conducted.
Install electrical monitoring equipment to switchboards to monitor current loads, voltages, KWH and Power Factor.
Leave equipment on-site for recording for approx. 5 days or to the agreed time to suit the site Inspect and record location and type of light and power fittings installed.
Measure lighting & power levels using equipment and access all recorded results once equipment disconnected.
Offer solutions to reduce power consumption and possible cost saving